Tuesday, 19 November 2013

Production Schedule.

Production Schedule
Location Visit Sheet

Programme Title: Crazy good
Client: Ashleigh Westcott
Writer: Mary Sarah
Producer: Lucie
Director: Lucie
Date: XX


Rough Sketch/Explanation of location and key points to note:

Bedroom; with a mirror and hair brush. Girly.
Outside; with the trees. Walking. Boy.
Stage. No audience so need to make it look as though there is one. Microphone. Robert clack school assembly hall? Ask permission.


Access to location via:

Permission from head of sixth form.

Name and number of location contact:

Robert clack school

 Health and Safety Issues to note:

●      Stage – might fall
●      Filming around trees, may bump into one.
●      May trip up while outside on sticks ad branches.

Potential Filming Problems :

●      When I need to use the stage it may already be in use
●      People may not want us to use the school stage
●      Bedroom may become a problem due to timing issues
●      It may have started to become too cold by now
●      Rain?


Additional Notes:  (map of area/weather forecast etc)


This is The Chase where i am going to film the outside scene. This is not the exact place however, I am aiming to find somewhere that looks nicer.

 The weather is supposed to be bad; snowing and cold. However, I am hoping I can work around this. I might have to shoot the outside scenes prior to the inside scenes. I can then edit this to the way I want.









No comments:

Post a Comment